According to the process, take a comprehensive thinking for the initial check and debugging, and then have a detailed inspection item by item and try to solve the problems. The sequence criterion of the inspection items listed in the process is that those which can be understood by inspection or interrogation without major operation should be prioritized. That is, start with easy ones and then move on to difficult ones. According to the past on-site maintenance experience and the self-needed sequence demand, those which present higher frequency of occurrence and are most likely to occur again in the future are required to be checked first. If the initial step has confirmed the cause of the following several problems, you can make a detailed inspection in advance.
The analysis for the instability of the electromagnetic flow meter when it returns to zero. In the industrial production, the electromagnetic flow meter often encounters the unstable situation when returning to zero. There are many reasons for this problem. According to the experience of technical personnel for many years, there are mainly the following five factors:
1. The pipeline is not filled with liquid or the liquid contains bubbles, which objectively means that there is no activity in the flow sensor but there is a trace of activity in practice.
2. The use of the valve for a long time or incomplete valve sealing. Dirty liquid will also lead to the emergence of zero point instability phenomenon.
3. Liquid conductivity changes or is uneven, which in the static will make the zero point change and the output shake in activity.
4. Because the scale on the outer surface of the inner wall and the pollution level of the electrode cannot be completely the same and symmetrical, the equilibrium of the initial zero setting will be destroyed.
5. The change of the state of the power equipment near the flow sensor (such as the increase of the leakage current) constitutes the change of the ground potential, which will also cause the zero point change of the intelligent electromagnetic flow meter. Through the analysis of the problem, we can find the corresponding solution according to the corresponding phenomenon.
First of all, check and debugging: Follow the process of checking the instability of the electromagnetic flow meter when it returns to zero. According to the process, take a comprehensive thinking for the initial check and debugging, and then have a detailed inspection item by item and try to solve the problems. The sequence criterion of the inspection items listed in the process:
(1) Through observation or inquiry, it can be understood that the ones that do not require major operation are the first, that is, the easier ones come first and the harder ones come later;
(2) According to the past on-site maintenance experience, the ones with higher frequency and higher probability of future occurrence come first;
(3) According to the self-needed sequence demand, if the initial step has confirmed the cause of the following several problems, you can make a detailed inspection in advance.